{"id":51289,"date":"2026-07-25T08:50:36","date_gmt":"2026-07-25T12:50:36","guid":{"rendered":"https:\/\/cetechsupport.com\/?page_id=51289"},"modified":"2026-07-25T17:11:13","modified_gmt":"2026-07-25T21:11:13","slug":"ce-vrf-assisted-start-up-program","status":"publish","type":"page","link":"https:\/\/cetechsupport.com\/fr\/ce-vrf-assisted-start-up-program\/","title":{"rendered":"Programme de d\u00e9marrage assist\u00e9 par VRF"},"content":{"rendered":"<p class=\"wp-block-paragraph\">The following steps outline the CE VRF Assisted Start-Up process from pre-planning through final scheduling. Please review each section carefully before continuing to the request forms. Required documentation must be complete and submitted before an Assisted Start-Up appointment can be confirmed.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Select each section to learn more.<\/strong><\/p>\n\n\n\n<div class=\"wp-block-coblocks-accordion ce-accordion\">\n<div class=\"wp-block-coblocks-accordion-item\"><details open><summary class=\"wp-block-coblocks-accordion-item__title\">Step 1: Pre-Planning After Equipment Is Ordered<\/summary><div class=\"wp-block-coblocks-accordion-item__content\">\n<p class=\"wp-block-paragraph\">Once the VRF equipment has been ordered, the contractor should begin the pre-planning process with CE.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The contractor is responsible for providing CE with the project&nbsp;<strong>vPro file<\/strong>&nbsp;and any other required system information.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">To begin pre-planning, the contractor will complete the Technical Support Form on the next page.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">CE will review the submitted information and contact the contractor to discuss the project.<\/p>\n<\/div><\/details><\/div>\n\n\n\n<div class=\"wp-block-coblocks-accordion-item\"><details><summary class=\"wp-block-coblocks-accordion-item__title\">Step 2: Pre-Job Walk-Through<\/summary><div class=\"wp-block-coblocks-accordion-item__content\">\n<p class=\"wp-block-paragraph\">A pre-job walk-through may be scheduled during the installation process.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">During this visit, the&nbsp;<strong>VRF Technical Support Representative<\/strong>&nbsp;may review:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>System design and layout<\/li>\n\n\n\n<li>Equipment application<\/li>\n\n\n\n<li>Piping considerations<\/li>\n\n\n\n<li>Control layout<\/li>\n\n\n\n<li>Jobsite conditions<\/li>\n\n\n\n<li>Potential installation concerns<\/li>\n\n\n\n<li>Items that may affect start-up<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">The pre-job walk-through is intended to help identify possible concerns before the final start-up request is submitted.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Please allow at least&nbsp;<strong>two weeks\u2019 advance notice<\/strong>&nbsp;when requesting a pre-job walk-through.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<div class=\"wp-block-uagb-buttons uagb-buttons__outer-wrap uagb-btn__default-btn uagb-btn-tablet__default-btn uagb-btn-mobile__default-btn uagb-block-4f39a360\"><div class=\"uagb-buttons__wrap uagb-buttons-layout-wrap\">\n<div class=\"wp-block-uagb-buttons-child uagb-buttons__outer-wrap uagb-block-4b267683 wp-block-button\"><div class=\"uagb-button__wrapper\"><a class=\"uagb-buttons-repeater wp-block-button__link\" aria-label=\"\" href=\"https:\/\/cetechsupport.com\/fr\/vrf-assisted-start-up-pre-planning-request\/\" rel=\"follow noopener\" target=\"_blank\" role=\"button\"><div class=\"uagb-button__link\">VRF Assisted Start-Up \u2014 Pre-Planning Request<\/div><\/a><\/div><\/div>\n<\/div><\/div>\n<\/div><\/details><\/div>\n\n\n\n<div class=\"wp-block-coblocks-accordion-item\"><details><summary class=\"wp-block-coblocks-accordion-item__title\">Step 3: Complete the Installation<\/summary><div class=\"wp-block-coblocks-accordion-item__content\">\n<p class=\"wp-block-paragraph\">Before requesting Assisted Start-Up, the VRF system must be fully installed and ready to operate.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The contractor is responsible for completing all installation work, including:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Indoor and outdoor unit installation<\/li>\n\n\n\n<li>Refrigerant piping<\/li>\n\n\n\n<li>Pressure testing<\/li>\n\n\n\n<li>Evacuation<\/li>\n\n\n\n<li>Electrical wiring<\/li>\n\n\n\n<li>Communication wiring<\/li>\n\n\n\n<li>Control installation<\/li>\n\n\n\n<li>Condensate piping<\/li>\n\n\n\n<li>Required clearances<\/li>\n\n\n\n<li>Jobsite access<\/li>\n\n\n\n<li>System documentation<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">CE does not perform installation work, repairs, or corrective labor.<\/p>\n<\/div><\/details><\/div>\n\n\n\n<div class=\"wp-block-coblocks-accordion-item\"><details><summary class=\"wp-block-coblocks-accordion-item__title\">Step 4: Complete Required Checklists<\/summary><div class=\"wp-block-coblocks-accordion-item__content\">\n<p class=\"wp-block-paragraph\">Once the installation is complete, the contractor must complete the required VRF and control installation checklists.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A separate checklist may be required for each system and control setup.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The contractor must also provide:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Completed VRF Installation Checklist<\/li>\n\n\n\n<li>Completed Control Installation Checklist, if applicable<\/li>\n\n\n\n<li>Updated or edited piping diagram<\/li>\n\n\n\n<li>Requested start-up dates<\/li>\n\n\n\n<li>Any additional information requested by CE<\/li>\n<\/ul>\n\n\n\n<div class=\"wp-block-uagb-buttons uagb-buttons__outer-wrap uagb-btn__default-btn uagb-btn-tablet__default-btn uagb-btn-mobile__default-btn uagb-block-4aba9503\"><div class=\"uagb-buttons__wrap uagb-buttons-layout-wrap\">\n<div class=\"wp-block-uagb-buttons-child uagb-buttons__outer-wrap uagb-block-b028ca78 wp-block-button\"><div class=\"uagb-button__wrapper\"><a class=\"uagb-buttons-repeater wp-block-button__link\" aria-label=\"\" href=\"https:\/\/cetechsupport.com\/fr\/vrf-assisted-start-up-forms\/\" rel=\"follow noopener\" target=\"_blank\" role=\"button\"><div class=\"uagb-button__link\">VRF Assisted Start-up Forms<\/div><\/a><\/div><\/div>\n\n\n\n<div class=\"wp-block-uagb-buttons-child uagb-buttons__outer-wrap uagb-block-d826b126 wp-block-button\"><div class=\"uagb-button__wrapper\"><a class=\"uagb-buttons-repeater wp-block-button__link\" aria-label=\"\" href=\"https:\/\/cetechsupport.com\/fr\/vrf-startup-guides-software\/\" rel=\"follow noopener\" target=\"_blank\" role=\"button\"><div class=\"uagb-button__link\">VRF Startup guides &amp; Software<\/div><\/a><\/div><\/div>\n<\/div><\/div>\n<\/div><\/details><\/div>\n\n\n\n<div class=\"wp-block-coblocks-accordion-item\"><details><summary class=\"wp-block-coblocks-accordion-item__title\">Step 5: Submit Assisted Start-Up Request<\/summary><div class=\"wp-block-coblocks-accordion-item__content\">\n<p class=\"wp-block-paragraph\">After the required documents are complete, the contractor will submit the Assisted Start-Up request on the next page.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The request must include all required documents before it can be reviewed.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Incomplete submissions may delay scheduling.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"> Please provide at least&nbsp;<strong>two weeks\u2019 advance notice<\/strong>&nbsp;when selecting requested dates.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<div class=\"wp-block-uagb-buttons uagb-buttons__outer-wrap uagb-btn__default-btn uagb-btn-tablet__default-btn uagb-btn-mobile__default-btn uagb-block-d4a52649\"><div class=\"uagb-buttons__wrap uagb-buttons-layout-wrap\">\n<div class=\"wp-block-uagb-buttons-child uagb-buttons__outer-wrap uagb-block-02170361 wp-block-button\"><div class=\"uagb-button__wrapper\"><a class=\"uagb-buttons-repeater wp-block-button__link\" aria-label=\"\" href=\"https:\/\/cetechsupport.com\/fr\/ce-vrf-assisted-start-up-final-start-up-request\/\" rel=\"follow noopener\" target=\"_blank\" role=\"button\"><div class=\"uagb-button__link\">CE VRF Assisted Start-Up \u2014 Final Start-Up Request<\/div><\/a><\/div><\/div>\n<\/div><\/div>\n<\/div><\/details><\/div>\n\n\n\n<div class=\"wp-block-coblocks-accordion-item\"><details><summary class=\"wp-block-coblocks-accordion-item__title\">Step 6: CE Review and Scheduling<\/summary><div class=\"wp-block-coblocks-accordion-item__content\">\n<p class=\"wp-block-paragraph\">After the request is submitted, the&nbsp;<strong>VRF Technical Support Team<\/strong>&nbsp;will review the information for completeness and project readiness.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">If the information is complete, the&nbsp;<strong>VRF Technical Support Representative<\/strong>&nbsp;will respond with:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Confirmation of received documents<\/li>\n\n\n\n<li>Any required additional charge documents<\/li>\n\n\n\n<li>Available start-up date<\/li>\n\n\n\n<li>Any additional questions or requirements<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">CE will make every effort to accommodate one of the requested start-up dates, but scheduling depends on availability and project readiness.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A requested date is not confirmed until CE provides confirmation.<\/p>\n<\/div><\/details><\/div>\n\n\n\n<div class=\"wp-block-coblocks-accordion-item\"><details><summary class=\"wp-block-coblocks-accordion-item__title\">Step 7: Site Readiness Requirement<\/summary><div class=\"wp-block-coblocks-accordion-item__content\">\n<p class=\"wp-block-paragraph\">The full VRF system and all related components must be ready to operate when the&nbsp;<strong>VRF Technical Support Representative<\/strong>&nbsp;arrives on site.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">If the system is not ready, additional fees may apply and the start-up may need to be rescheduled.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Site readiness includes, but is not limited to:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Equipment installed<\/li>\n\n\n\n<li>Piping complete<\/li>\n\n\n\n<li>Pressure test complete<\/li>\n\n\n\n<li>Evacuation complete<\/li>\n\n\n\n<li>Wiring complete<\/li>\n\n\n\n<li>Controls installed and connected<\/li>\n\n\n\n<li>Condensate complete<\/li>\n\n\n\n<li>Power available<\/li>\n\n\n\n<li>Jobsite access available<\/li>\n\n\n\n<li>Required forms completed<\/li>\n\n\n\n<li>Updated piping diagram submitted<\/li>\n<\/ul>\n<\/div><\/details><\/div>\n<\/div>\n\n\n\n<p class=\"has-text-align-center has-ast-global-color-8-color has-luminous-vivid-amber-background-color has-text-color has-background has-link-color wp-elements-723a89077ec0f7c07676980e189f9cc5 wp-block-paragraph\" style=\"border-top-left-radius:70px;border-top-right-radius:70px;border-bottom-left-radius:70px;border-bottom-right-radius:70px\"><strong>Important:<\/strong>&nbsp;CE provides assisted start-up guidance only. The contractor is responsible for completing the installation, preparing the system for operation, and performing the start-up. CE does not install equipment, make repairs, correct deficiencies, or provide labor to make the system operational.<\/p>","protected":false},"excerpt":{"rendered":"<p>The following steps outline the CE VRF Assisted Start-Up process from pre-planning through final scheduling. Please review each section carefully before continuing to the request forms. Required documentation must be complete and submitted before an Assisted Start-Up appointment can be confirmed. Select each section to learn more. Important:&nbsp;CE provides assisted start-up guidance only. The contractor [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_coblocks_attr":"","_coblocks_dimensions":"","_coblocks_responsive_height":"","_coblocks_accordion_ie_support":"'true'","_uag_custom_page_level_css":"","site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"set","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"class_list":["post-51289","page","type-page","status-publish","hentry"],"uagb_featured_image_src":{"full":false,"thumbnail":false,"medium":false,"medium_large":false,"large":false,"1536x1536":false,"2048x2048":false,"trp-custom-language-flag":false},"uagb_author_info":{"display_name":"Josh Goodman","author_link":"https:\/\/cetechsupport.com\/fr\/author\/joshg\/"},"uagb_comment_info":0,"uagb_excerpt":"The following steps outline the CE VRF Assisted Start-Up process from pre-planning through final scheduling. Please review each section carefully before continuing to the request forms. Required documentation must be complete and submitted before an Assisted Start-Up appointment can be confirmed. Select each section to learn more. Important:&nbsp;CE provides assisted start-up guidance only. The contractor&hellip;","_links":{"self":[{"href":"https:\/\/cetechsupport.com\/fr\/wp-json\/wp\/v2\/pages\/51289","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cetechsupport.com\/fr\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/cetechsupport.com\/fr\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/cetechsupport.com\/fr\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/cetechsupport.com\/fr\/wp-json\/wp\/v2\/comments?post=51289"}],"version-history":[{"count":18,"href":"https:\/\/cetechsupport.com\/fr\/wp-json\/wp\/v2\/pages\/51289\/revisions"}],"predecessor-version":[{"id":51385,"href":"https:\/\/cetechsupport.com\/fr\/wp-json\/wp\/v2\/pages\/51289\/revisions\/51385"}],"wp:attachment":[{"href":"https:\/\/cetechsupport.com\/fr\/wp-json\/wp\/v2\/media?parent=51289"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}